IBR Approved · Alloy Steel (CrMo)

ASTM A234 WP11 Buttweld Pipe Fittings

1.25Cr-0.5Mo-Si chromium-molybdenum alloy steel fittings for boiler headers, superheater and reheater piping to ~580°C. Elbows, tees, reducers and caps to ASME B16.9 / B16.28, IBR approved with Form IV (Part D) (formerly Form III-C), EN 10204 3.1 / 3.2 traceable.

ASME B16.9 IBR Form IV (Part D) PWHT Required To 580°C

Where WP11 Is Used

  • ✓ Boiler headers and superheater and reheater piping
  • ✓ Steam lines in power and process plants
  • ✓ Refinery fired-heater and process piping at elevated temperature

WP11 Compared With Related Grades

GradeChemistryKey difference
A234 WP121Cr-½MoLower silicon; often specified alongside WP11
A234 WP111¼Cr-½Mo-SiSilicon 0.50–1.00% for better oxidation resistance
A234 WP222¼Cr-1MoHigher chromium and molybdenum for higher temperatures
A234 WP55Cr-½MoMore chromium for hydrogen and sulphur-bearing refinery service

How to Specify WP11 Fittings on a Purchase Order

A complete order line avoids clarification rounds. Example:

Equal tee, 6" SCH 80, ASTM A234 WP11 Class 1, ASME B16.9, IBR Form IV (Part D), EN 10204 3.1

  • ✓ State Class 1 or Class 2 (different strength levels)
  • ✓ Ask for the heat treatment record and hardness results
  • ✓ Add IBR Form IV (Part D) for Indian boiler piping

Grade Overview

ASTM / ASME A234 WP11 is a 1.25Cr-0.5Mo-Si chromium-molybdenum alloy steel for wrought buttweld fittings in elevated-temperature service. The chromium and molybdenum give significantly better creep strength and oxidation resistance than carbon steel above 450°C, while the silicon addition improves scale resistance. It is the entry grade of the CrMo alloy ladder, used up to approximately 580°C.

For boiler and steam piping under the Indian Boiler Regulations, WP11 fittings are supplied IBR approved with Form IV (Part D). Its EN counterpart is the silicon-bearing grade 10CrMo5-5 (material number 1.7338).

PWHT is mandatory

All WP11 welds require post-weld heat treatment, typically 690–730°C, to temper the hardened heat-affected zone and avoid hydrogen cracking. Post-PWHT hardness and the time-temperature record are reported on the EN 10204 3.1 certificate. Filler metal: ER80S-B2 (GTAW) / E8018-B2 (SMAW). ASME P-No. 4.

Chemical Composition — A234 WP11

ElementRequirementNote
Carbon (C)0.05 – 0.15%Weldability
Manganese (Mn)0.30 – 0.60%—
Silicon (Si)0.50 – 1.00%Oxidation / scale resistance
Chromium (Cr)1.00 – 1.50%Creep & oxidation
Molybdenum (Mo)0.44 – 0.65%Creep resistance
P / S≤ 0.030% eachImpurity limits

Mechanical Properties — A234 WP11 (Class 1)

PropertyRequirement
Tensile Strength415 – 585 MPa (60 – 85 ksi)
Yield Strength (min)205 MPa (30 ksi)
Elongation (min)≥ 20% (per specification formula)
Heat TreatmentAnnealed or normalised & tempered; PWHT after welding

Equivalent Grades

Product FormSpecification
Buttweld fittingsASTM / ASME A234 WP11
Seamless pipeASTM A335 P11
Forgings / flangesASTM A182 F11
EN designation10CrMo5-5 (W.Nr. 1.7338)

EN 10253 equivalent: see WP11 pipe fittings on arshyapipefittings.com, and the European grade EN 1.7338 (10CrMo5-5).

Fitting Types Available in WP11

  • Elbows — 45° / 90° / 180°, LR & SR
  • Tees — equal & reducing
  • Reducers — concentric & eccentric
  • Caps — buttweld end closures

Related grades: WP22 · WP5 · WP91 · IBR Form IV (Part D) guide · IBR grades list · Carbon vs alloy vs stainless

Testing & Inspection — WP11

  • Chemical analysis of each heat, confirming 1.25Cr-0.5Mo with the silicon addition that improves oxidation resistance.
  • Tensile and hardness tests to ASTM A234 for the class ordered (Class 1 shown above; Class 2 and 3 on request).
  • Positive material identification (PMI) to confirm chromium and molybdenum and prevent mix-ups with carbon steel or WP22.
  • Dimensional and visual inspection to ASME B16.9; NDE (MT / UT / RT) as specified in your purchase order.

Dimensions & Size Range — ASME B16.9

WP11 fittings are made to ASME B16.9 (long-radius) and ASME B16.28 (short-radius elbows) dimensions, from 1/2" to 48" NB and above, in schedules SCH 20 to SCH 160 / XXS. Wall thickness matches the connecting pipe schedule. Centre-to-end dimensions for the most-ordered sizes:

NPSOutside diameter (mm)90° LR elbow “A” (mm)45° LR elbow “B” (mm)Equal tee “C” (mm)
1/2"21.3381625
1"33.4382238
2"60.3763564
3"88.91145186
4"114.315264105
6"168.322995143
8"219.1305127178
10"273.1381159216
12"323.9457190254
16"406.4610254305
20"508.0762318381
24"610.0914381432

Long-radius elbows have a centre-line radius of 1.5 × NPS; short-radius (ASME B16.28) 1.0 × NPS. Full tables to NPS 48, reducing tees, reducers and caps are available with every quotation. For EN 10253 dimensions see arshyapipefittings.com.

Export Documentation & Packing

We ship WP11 fittings to projects outside India with the documents EPC contractors and inspection agencies expect:

  • Mill test certificate — EN 10204 3.1 as standard; 3.2 with third-party witness
  • Third-party inspection — Bureau Veritas, TÜV, Lloyd’s Register, SGS, DNV or the client’s own inspector
  • IBR Form IV (Part D) — for boiler piping on Indian Boiler Regulations projects
  • Traceability — every fitting marked with grade, size, schedule and heat number, matching the certificate
  • Packing — seaworthy wooden cases or pallets, bevel ends protected with end caps
  • Shipping documents — commercial invoice, packing list and certificate of origin; FOB, CFR or CIF terms

Send your BOQ through the RFQ form (Excel or PDF attachments accepted) or on WhatsApp — quotations are usually issued within 24 hours.

WP11 Fittings — Frequently Asked Questions

What is the difference between WP11 Class 1, 2 and 3?

The chemistry is the same; the classes differ in strength. Per ASTM A234: Class 1 — 415–585 MPa tensile, 205 MPa min. yield; Class 2 — 485–655 MPa tensile, 275 MPa yield; Class 3 — 520–690 MPa tensile, 310 MPa yield. Specify the class on your enquiry.

How does WP11 compare with WP22?

WP11 (1.25Cr-0.5Mo) suits boiler and steam lines at moderate temperatures. WP22 (2.25Cr-1Mo) has higher creep strength and better resistance to high-temperature hydrogen, so it is preferred in hydroprocessing and hotter steam service. See P11 and P22 in boiler and steam service.

Is post-weld heat treatment required for WP11?

Yes — PWHT at 690–730°C is mandatory after welding to temper the heat-affected zone and relieve stresses.

Need IBR Approved WP11 boiler-grade fittings?

Request a Detailed Quote